SAN MATEO COUNTY, CA 

Accessory Dwelling Units (ADU) City Guidelines


Zoning:

Non-Coastal Zones - R-1 | R-2 | R-E | RH | RM | TPZ

Coastal Zone - R-1

Lot Size:

Second units are EXEMPT from minimum lot area restrictions per Sec. 6429.

Maximum ADU Floor Area:

Attached: 750 sq.ft. or 50% of primary dwelling floor area, whichever is larger, up to 1,200 sq.ft.

Detached: 750 sq.ft. or 35% of the floor area of the existing or proposed primary dwelling, whichever is larger, up to 1,200 sq.ft.

Note: Floor Area of ADU shall count against the total allowed floor area of a parcel, such that the total floor area of the ADU and primary dwelling shall not exceed the maximum floor area allowed within the zoning district.

No. of Bedrooms:  

No min/max

Storage / Closet:

No min/max

Kitchen / Bath:  

Require separate bathroom and kitchen facilities (permanent range, counters, refrigerator, sink).  

Parking:

One new parking space, in addition to those already existing on the lot, shall be provided on-site for each studio, one bedroom, and two bedroom ADU.  Two new parking spaces shall be provided on-site for each ADU with three or more bedrooms.

Parking exceptions apply.

Setbacks:  

Required setbacks of applicable district notwithstanding, ADU setbacks are:

Detached ADU of 16’ or less height - Side setback 5’ | Rear setback 5’

Detached ADU greater than 16’ - Side setback 5’ | Rear setback 10’

Detached ADU and Other Buildings - Setback from foundation to foundation is 5’

Detached ADU in Front of Primary Residence - If any portion of an ADU is located in front of the primary dwelling, then the front and side setbacks applicable to the ADU shall be those required of the primary dwelling in the same zoning district.

Detached ADU and Property Lines - If different setbacks to property lines are required by any other section of the Zoning Regulations, those requirements shall be disregarded, and the standards listed above shall govern.

Attached ADU and Garage ADU - Attached ADUs must comply with the same setbacks as the primary dwelling. ADUs constructed entirely within an existing garage are exempt from setback requirements. ADUs constructed above an existing garage, regardless of height, are subject to the same setbacks as a Detached ADU of 16’ or less height.

Height:

26’ maximum

Location:

N/A

Rear Yard Coverage:

Must maintain consistency with zoning requirements designated for the lot.

Materials / Design:

ADUs are not subject to design review, except for ADUs located in the Coastal Zone which are subject to the design review requirements incorporated in the County’s Local Coastal Program.

Entryways:

ADU entrance must be independently accessible and must not require passage through the primary residence. For Attached ADUs, any new entrances and exits shall face the side and rear of the lot only.

Join Our Mailing List!

Name *
E-mail *
 

acton-contact1.png

Acton Construction is a close-knit group that shares the same commitment to creative innovation, reliable service and exceptional quality.

See Our People

View Careers

Acton Construction serves Silicon Valley and the surrounding areas of Campbell, Cupertino, Los Altos, Los Gatos, Menlo Park, Palo Alto, San Jose, Santa Clara and Saratoga.

Testimonials

View Homeowner Reviews

View Our Services View Our Services
View Our Projects View Our Projects
Contact Us Contact Us